Presentation of the Participatory Diagnosis results in Sbeitla
After receiving the diagnostic sheets from the local NGOs, the Associative Action organized a meeting on February 18th, 2016 to present the results of the diagnosis to the members of the municipality and the local NGOs of Sbeitla
The table below illustrates the results of the Participatory Diagnosis for the municipality of Sbeitla:
As shown in the table, and for all areas in the municipality of Sbeitla, the estimated total cost of basic infrastructure needs in investment is equal to 16 732 451 TD divided as follows:
– the estimated cost of the needs in terms of investment in roads is equal to 5 814 505 TD
– the estimated cost of the needs in terms of investment in pavement is equal to 2 765 364 TD
– the estimated cost of investment needs in rainwater management system is equal to 6 630 000 TD
– the estimated cost of the needs in terms of investment in public lighting is equal to 1085 820 TD
– the estimated cost of the needs in terms of investment in embellishment is equal to 265 762 TD
– the estimated cost of the needs in terms of cultural investment is equal to 71 000 TD
– the estimated cost of the needs in terms of sports investment is equal to 100 000 TD
The table also allows to present the results by zone (the municipality of Sbeitla was split in to 03 zones for the diagnosis).